Details

Keywords Change this

Reconstruction, Concrete

Project timeline

2013 – 2014

Type

Museum

Location Change this

Ebertallee 59-71
06846 Dessau
Germany

Current state

Restored (after demolition)

Architect Change this

__

Article last edited by Bostjan on
June 14th, 2019

Master Houses Reconstruction Change this

1 of 17

Description Change this

After the removal of the Bauhäusler 1932 the master houses were changed by alterations strongly. The houses of Gropius and Moholy-Nagy fell in the last days of World War II to a bomb attack victim, in GDR times was built on the foundation of House Gropius a detached house with pitched roof, which was later demolished. The resulting gaps in the building ensemble were closed in 2014. It has deliberately avoided a historically accurate reconstruction. The Berlin architecture office Bruno Fioretti Marquez (BFM) designed an architecture of blur for the two destroyed houses. It enables a very conscious perception between inventory and reinterpretation.


Sources

Comments

Register to join to conversation.