Search results for keyword Office building
House of Soviets (Saint Petersburg)
by Noi Trotsky
The House of Soviets (Russian: Дом Советов, Dom Sovetov) is the office building built in Stalinist style in the late 1930's in Saint Petersburg (then Leningrad). It is located in the Moskovsky District of Saint Petersburg.
According to Soviet projects, the House of Soviets was planned to host..

BASF Building
by Gabriel Tellez, ...
The BASF corporate building is situated in Insurgentes Avenue, one of the most famous avenue in Mexico City.
The ground floor is of 1,315.0 m2 and each standard floor of approximately 942.0 m2. The shape has three differently-oriented squares brought together by a central core.
BASF's..

UPSIDE Araguaia
by Cité Arquitetura
Urban connection
The Araguaia project is located in the neighborhood of Jacarepagua, west side of the Rio de Janeiro city. Its area of 7579.64 hectares and a population of approximately 160,000 inhabitants is becoming a very relevant to the city. In recent years, traditional residential areas..

Eurogıda Administrative Building
by Öney Architecture
The project consists of the design of the planned production facilities on an area of 72 decares of land located at the agricultural organized industrial zone in Kemalpaşa, İzmir. The land extending on the north-south axis borders with a stream on the east side and has a free view towards this..
Add to a collection
Marco Milazzo
born 1974, Rio de Janeiro

Buzesti Office Building
by Dorin Ștefan
Buzesti street appeared in Bucharest several years ago as a response to the auto congestion within the center of the city. This part of the city is currently work in progress, the old urban tissue still being strongly present. As a new uptown Bucharest is expected to emerge in this area,..
Add to a collection
Sena building
by Germán Samper
The Sena building of 1958 is an important step towards utilizing concrete in its maximum expression. This building designated for teaching is located on a small site and height was used as a design solution to achieve the desired effect. The block has a north-south orientation; the intense..
Add to a collection
Avianca Building
by Germán Samper
The building for Avianca airline was the first highrise built in Bogota. It is located in front of Santander Park and is neighbored by three colonial churches as well as a repertoire of modern buildings. In spite of its massive size, 37 stories, and 4 basements, the freestanding structure is..
Add to a collection
Zanussi Offices
by Gino Valle
The building structure is made up of large transverse frames at factory body and coupled to 2.4m, equal to two modules, with lateral overhangs of 3,6m. The main distance of 7.8m is equal to six modules. The expansion joints are located in the axis of the pillars pairs, each 19,2m. The pillars..
Add to a collection
Rectorate of the Vrije University
by Renaat Braem
The Rector's Building of the VUB is one of the last masterpieces of Renaat Braem built between 1974 and 1978 under a building permit from 1973. The Rectorate Building illustrates the plastic aspect and the free aesthetics that he developed at the end of his career. This building can be..
Add to a collection
8 Finsbury Circus
by WilkinsonEyre
In 2011 WilkinsonEyre was appointed for the redevelopment of River Plate House in
Finsbury Circus. The development worked towards an overall vision for an
‘exemplary’ new office building for this historic City site adjacent to the listed Britannic House by Edwin Lutyens, with access from both..

Interieur Design Office building
by Söhne & Partner Architects
The ca. 10.000 m² large concern offers office space for more than 500 people and public areas such as restaurants, gardens and fitness rooms. The lobby on the ground floor has been transformed into a sweeping shape and connects the two office towers which are linked to the lobby. The company’s..
Add to a collection
Corporate Offices
by NS3 Concept
Interior Design and Build for Corporate Office, Turnkey Contracting in Mumbai, India
Add to a collection
Business center Vrelec
by Andrej Strehovec, ...
https://strehovecarchitecture.wordpress.com/2018/05/18/business-center-fountain-with-ravnikar-potokar-d-o-o/
Add to a collection
Byblos Town Hall
by Hashim Sarkis
Hashim Sarkis was awarded the commission of the new Byblos Town Hall after an anonymous open competition. Byblos, one of the oldest continuously inhabited cities in the world and a World Heritage Site, has been growing outside the historic city bounds to the point where most of the city’s..
Add to a collection
The Istanbul Advertisement Building
by Günay Çilingiroğlu, ...
The Istanbul Advertisement Building which has also been designed and carried out by Günay Çilingiroğlu and Muhlis Tunca in 1972 is one of the iconic buildings of Turkish modernism. Thanks to the vertical effect created by the naked concrete surfaces and also the virtual exposure of the structural..
Add to a collection
FPM 41 Office Building
by Barbas Lopes Arquitectos
In 2015, we were awarded the project for an Office Building and the surrounding areas in the business centre of Lisbon. Our proposal was to design a timeless building, clear and flexible enough to face any kind of eventualities, which are quite common at this scale. Constructive rationality,..
Add to a collection
State Savings Bank
by Arnas Funkas, ...
Besides the Savings Bank the building also hat to accommodate the Commerce Department, the Statistics Bureau, and some other state offices. The three blocks constructing the building form a half-closed yard. The main volume alongside the avenue has six storeys and the other two have five.
The..

Central Post Office of Kaunas
by Feliksas Vizbaras
Almost a full century stands between us, and the First Lithuanian Republic. It may seem like a very long time, and every monument that reminds us of that period is often seen as an outdated relic. The Central Post Office building, however, still stands as a perfect example for understanding the..
Add to a collection
WHO Headquarter
by Habib Rahman
The WHO headquarters in New, Delhi was built by Habib Rahman, who at the time was a senior architect with the Central Public Works Department (CPWD). The three-year project was completed in 1962 and inaugurated by Jawaharlal Nehru. A year later, the modernist Husain painted the mural on the walls..
Add to a collection