Details

Keywords Change this

Concrete, Modular, Prefabrication

Project timeline

2017 – January 2019

Type

Mixed Use

Location Change this

3730-282 Vale de Cambra
Portugal

Current state

Original

Architect Change this

Team

Samuel Gonçalves, Inês Vieira Rodrigues, Gonçalo Vaz de Carvalho, Maria João Freitas

__

Article last edited by SUMMARY on
April 29th, 2020

VDC Change this

Vale de Cambra, Portugal
by SUMMARY Change this

VDC © Fernando Guerra | FG + SG

1 of 8

Description Change this

The requirements for this project were boldly defined from the beginning: the construction should be fast, cost effective and changeable over time, which prompted the studio to use prefabricated elements and to leave parts of the project undefined, assuming the immediacy, flexibility and resources optimization as core themes.

The strategy was clear: a ground floor level for the multi-services program connected with the public space, crowned by the individual habitational units (six cabins with 45m2). Due to the differences between these two programs, it was created an independent access for each function, placing them in different levels and taking advantage of the natural ground’s slope.

The ground floor is shaped by prefabricated slabs and structural panels in the external perimeter. This area was conceived in a very flexible way: it’s possible to add or remove compartments or let the whole floor functioning as a big open space. Thus, the users may adapt the space according to their needs.

The first floor is all composed by Gomos System units. Considering that the maximum building area permitted by law was quite small, the requested empty space was used to separate the housing units. Designed and licensed as a collective housing building, with this feature this project offers the main advantages of single houses: clearly individualized entrances and a complete acoustic separation between the different units.

In the whole building, the structural material - precast concrete - is directly exposed, without any additional finishing, thus reducing the resources, the manpower and the arts involved in the construction process and, consequently, reducing its environmental impact. This approach has a direct effect in the acceleration of the building process: all its components are fully prepared in factory and quickly assembled in situ, performing at once as structure, insulation and cladding elements.

The building process on video: https://vimeo.com/369589538 (© Building Pictures)

Comments

Register to join to conversation.